Contract #40264008, Lower Silver Creek Flood Protection & Creek Restoration, SCVWD (Santa Clara Valley Water District) - San Jose, CA ($25.9M). Contract #10-240, Reach BW-1A Pima Canal Reach Rehabilitation & Lining Project –Gila River Indian Community – Coolidge, AZ ($23.2M).
Contract # 04-163744, Route 101 Doyle Drive, Caltrans - San
Francisco, CA ($57.7M).
Select the following links for more information about this project:
Contract #15PA-110, Earthquake Safety - Aerial
Structures M-Line, BART (Bay Area Rapid Transit District) - San Mateo, CA
($8.6M). Contract #15SU-110, Earthquake Safety - Aerial Structures W. Oakland, BART (San Francisco Bay Area Rapid Transit District) - Oakland, CA ($15.1M). Contract #6969, PCC Taxiway and Apron Pavement, Los Angeles World Airways – Los Angeles, CA ($81.9M)Contract #03-0A6334, Route 80 Near Truckee/East of Donner Lake U/C – Caltrans – Truckee, CA ($56.4M) Contract #04-264204, Caltrans, Route 101, Burlingame, CA ($140.7M) Joint Venture with DeSilva Gates as DeSilva Gates-Brosamer. Contract #8156M(PWC), City of Fremont, Washington Blvd./Paseo Padre Grade Separation, Fremont, CA. ($53.3M), Joint Venture with DeSilva Gates as DeSilva Gates-Brosamer. Click here for information on this project from the City of Fremont website.
|
|||||||||||||||||||||||
| Opening of LAX Cross-field Runway 5/24/2010 | |||||||||||||||||||||||
![]() |
|||||||||||||||||||||||
| Click here to see a larger version of the photo above | |||||||||||||||||||||||
|
|
|
||||||||||||||||||||||
|
Click here to see the Southern California Public Radio news coverage of the Taxiway opening. |
|||||||||||||||||||||||